NuFlow - Reline, Repair, Renew
SEARCH:
Nu Flow Welcomes 50th Global Partner
Products
Structural Lining
Pull-in-Place
Inversion
Spot Repair
Lateral Connection Liners
Epoxy Lining
Forced Air Lining
Mechanical Lining
Semi-Structural Lining
Neofit
Pipe Capacity Restoration
Pneumatic Restoration
Mechanical Restoration
Hydro Restoration
Consulting Services
Critical Path Management
Finance and Budgeting
Educational Programs
Infrastructure Preservation
Systems Assessment
Manufacturing
Epoxies
Potable Epoxy
Structural Epoxy
Custom Epoxy
Structural Liners
Blown-In Liners
Barrier Spray
Spot Repair Kits
Drain Lining Equipment
Mini Cutters / Scorpion Cutters
Heavy Duty Microcutters
Rollers
Winch
Pull Heads
Air Ends
Mixer Paddles
Potable Lining Equipment
Sand Blaster
Air Manifold
Compact Air Manifold
Dust Collector
Air Purifying & Drying Unit
Partners
Partner Program Overview
Distributor
Drain Partner
Potable Partner
Partner Events
Partner Resources
Training
Contact Us
Partner Extranet
News & Media
Nu Flow in the News
Reference Articles
Press Releases
Newsletters
Research Documents & Reports
Copper Piping Problems
Corrosion of Metal Pipes
Lead in Water
Sewer Concerns
Media Resources
Videos
About Us
Nu Flow America
Nu Flow Technologies
Corporate Overview
Certifications & Patents
Executive Team
Testimonials
Case Studies
Industry Events
Investor Relations
Careers
Career Listing
Office Locations
Contact Us
North America
International
Commercial
Industrial
Federal
Municipal
Homeowners
PRODUCTS
Free SixxacMenu module license
STRUCTURAL LINING
Pull-in-Place
Applications
How It Works
Certifications & Approvals
Technical Specifications
Inversion
Spot Repair
Lateral Connection Liners
EPOXY LINING
SEMI-STRUCTURAL-LINING
PIPE CAPACITY RESTORATION
CONSULTING SERVICES
1-800-834-9597
Testimonials
Request Info
Print this page
Email this page
HOW IT WORKS
Step 1: Pipe System Diagnosis
The project begins with mapping the internal plumbing system and camera inspection of drain and sewer lines. A plan is implemented to minimize disruption and afford the most efficient timeline for work completion. The piping system is inspected for integrity and spot repairs are made to excessively worn joints and fittings. Temporary bypass water piping may be installed. Depending on the lining method to be used, pipes may be drained and/or air-dried. After testing for leaks, the pipes are prepared for cleaning.
Step 2: Preparation and Cleaning
The next step involves removing roots and calcite in order to return the pipe to its original functioning diameter. Removal methods may include jetting the lines or the use of pneumatic tools such as a scorpion cutter. Cast pipe may require additional preparation if there is significant corrosion or missing sections of pipe.
Step 3: Structural Installation
Nu Flow’s patented trenchless lining system involves double-entry access to pull an epoxy-saturated felt liner with an internal bladder inside host pipe. The bladder is inflated for curing in place and is later removed, leaving in its place a smooth, jointless new pipe inside the host pipe. This lining method provides the ability to line multiple 45° and 90° angles, as well as the option of lining specific sections of pipe without lining the entire length.
Step 4: System Reassembly and Final Inspection
The liner is trimmed, and re-fitted to connect the lined service to the system. A final leak test and camera inspection confirm structural integrity. Water quality, volume, and flow tests confirm system functionality.